Run the simulation for
Today 60 to 180 days, every cycle
Traditional. Four parties, every cycle.
Day 0Process starts
Day 180One issuance, covering the whole period
Generator declaration
001of 180 days
0issuance for the period
One issuance, covering the whole period. Granularity, traceability, location and time stamp are not carried on it. The claim is a period total, prepared on paper and confirmed by a third party.
With C:Pesa® Read every 15 minutes
One appliance. Continuous data. Evidence on every certificate.
One appliance at the inverter Reads generation at source and seals every reading with its time, its location and the data behind it. 96 readings a day
→
Certificates carry the evidence Granularity. Traceability. Location. Time stamp. Issued by the Issuer after validation, not after paperwork
00:00Checkpoint
0.000 MWhIn this checkpoint
Measuring at source
00of 96 readings
0certificates issued